Low Water, a book about a river that is mostly pipe, is finished. Spring 2027.More

Writer portfolio
  • Home
  • Writing
  • About
  • Contact
Commission

Iva Rennard

I write about the things that have to work before anything else can

Water, freight and power lines, at the length the subject actually needs. Mostly for magazines, mostly reported on foot, and usually somewhere it is raining.

Read the workCommission something

In my own words

I am interested in the sentence nobody finishes. A town says the water comes from the reservoir, and stops there, and behind the full stop are ninety years of argument, a drowned village, four pumping stations and a man who drives around at night listening to pipes. That is the piece. I am not a campaigner and I am not an engineer; I am the person who goes and stands next to the thing, asks who decided, and then reads the minutes. It takes months and it does not scale, which is why I publish four or five times a year rather than four or five times a week.

Iva

Start here

Five I would want read first

If you have never read anything of mine, these are the ones to try, and the first is the one I would defend hardest.

  1. Kinnery Interchange from the footbridge at night

    8 August 2026The Long Field, 7,200 words

    Everything arrives at four in the morning

    A night shift at an inland rail freight terminal, and why the hour you are asleep is the hour the country is loaded.

  2. The overflow tower at Ashmoor reservoir

    30 October 2025The Long Field, 9,000 words

    Ashmoor, under

    The village at the bottom of the reservoir, the families who still hold the deeds, and the summer the water went down far enough to argue about it.

  3. A culverted river emerging from a brick arch

    12 September 2024Overspill, 7,800 words

    Low water

    A river that is mostly pipe, followed from the moor to the tap. This is the essay that turned into the book.

  4. A transmission pylon in a field of stubble

    19 June 2026Stanchion, 5,100 words

    Nine thousand amps over Brantwick

    What it is to farm underneath a transmission line, and what an easement is worth when it was signed in 1961.

  5. A narrow cargo barge tied up at a canal wharf

    14 February 2026Ballast, 6,400 words

    A barge called Mercy

    The last working cargo barge on the Dell Cut, her crew of two, and the arithmetic that keeps her moving for one more season.

Right now

What I am open to

The book takes most of the year. What is left is roughly one reported piece a quarter and a small amount of everything else.

  • I

    One long commission a quarter

    Reported features of three thousand words and up, with the travel agreed in advance. I am booked to February and taking enquiries beyond it.

  • II

    Shorter work, occasionally

    Essays, columns and the kind of report or catalogue piece that needs somebody who will actually go and look. Four or five a year.

  • III

    Talks, readings and teaching

    On long-form reporting, on infrastructure as a subject, and from spring on the book. I teach one week a year and enjoy it more than I expect to.

Published in

  • The Long Field
  • Ballast
  • Stanchion
  • Overspill
  • The Meridian
  • The Kettering Review

Something that needs more than a phone call

If you are an editor with a subject that will not fit in fifteen hundred words, write to me and tell me what the full stop is hiding.

Get in touchAbout me

Writer portfolio

Long pieces about water, freight and power lines. Written slowly, on purpose.

The work

  • Writing
  • About

Enquiries

  • Commissions
  • Talks
  • The book

Legal

  • Legal notice
  • Privacy
Text © Iva Rennard. Pieces first published elsewhere are reproduced with permission.